+7 925 966 4690, 9am6pm (GMT+3), Monday – Friday
ИД «Финансы и кредит»

JOURNALS

  

FOR AUTHORS

  

SUBSCRIBE

    
Finance and Credit
 

Building a probabilistic economic and mathematical model of an investment project using the Monte Carlo method

Vol. 30, Iss. 7, JULY 2024

Received: 8 February 2024

Received in revised form: 22 February 2024

Accepted: 7 March 2024

Available online: 30 July 2024

Subject Heading: INVESTING

JEL Classification: C51, C53

Pages: 1623-1640

https://doi.org/10.24891/fc.30.7.1623

Denis S. BEZRUCHKO Peter the Great St. Petersburg Polytechnic University (SPbPU), St. Petersburg, Russian Federation
dbezru@mail.ru

https://orcid.org/0000-0002-6891-5261

Subject. This article deals with economic and mathematical models of investment projects in various sectors of the economy, developed when making a decision to invest in a project.
Objectives. The article aims to develop methodological approaches to the construction of probabilistic economic and mathematical models of investment projects using the Monte Carlo method.
Methods. For the study, I used analysis and synthesis, forecasting and modeling, the Monte Carlo method, and generalization. Sixteen author-developed investment projects in various sectors of the economy served as the basis for the study.
Results. Probabilistic economic and mathematical models of investment projects are a more reliable tool for forecasting and analyzing project risks. The use of probabilistic models helps calculate the magnitude of those risks for which previously only qualitative (verbal) characteristics were available, such as the risk of loss of liquidity (the probability of a cash gap). Probabilistic models meet the requirements for digital twins of production systems. The Monte Carlo method is currently the only available method for constructing probabilistic economic and mathematical models of investment projects. Using the method does not require complex programming and data interpretation; calculations can be performed on low-power public computers. It is advisable to set the initial data (factors of influence) as the base value of the factor and its standard deviation within the normal distribution. The resulting probability distribution functions of key project performance indicators also have the form of a normal probability density distribution.
Conclusions and Relevance. New methodological approaches to the use of the Monte Carlo method for constructing probabilistic models of investment projects help implement another method of quantitative analysis of risk projects, helping draw conclusions about the financial sustainability of the project that were previously not available without the use of this method. The results of the study can be used by financial analysts when developing or examining economic and mathematical models in order to determine the likelihood of obtaining the estimated economic efficiency of the project, as well as calculating the likelihood of a cash gap occurring in the investment or operational phase of the project.

Keywords: economic and mathematical modeling, probabilistic models, project risk analysis, Monte Carlo method

References:

  1. Shapkin A.S., Shapkin V.A. Teoriya riska i modelirovanie riskovykh situatsii [Risk theory and modeling of risk situations]. Moscow, Dashkov i Ko Publ., 2009, 880 p.
  2. Vinokur I.R. [The method of risk analysis and management]. Vestnik Permskogo natsional'nogo issledovatel'skogo politekhnicheskogo universiteta. Sotsial'no-ekonomicheskie nauki = PNRPU Sociology and Economics Bulletin, 2019, no. 3, pp. 93–108. (In Russ.) URL: Link
  3. Metropolis N., Ulam S. The Monte Carlo Method. Journal of the American Statistical Association, 1949, vol. 44, no. 247, pp. 335–341. URL: Link
  4. Fishman G.S. Monte Carlo: Concepts, Algorithms, and Applications. Springer, 1996, 698 p.
  5. Sobol' I.M. Metod Monte-Karlo [The Monte Carlo Method]. Moscow, Nauka Publ., 1968, 64 p.
  6. Ramenskaya A.V., Pivovarova K.V. Metod Monte-Karlo i instrumental'nye sredstva ego realizatsii: metodicheskie ukazaniya [Monte Carlo method and tools for its implementation: methodological instructions]. Orenburg, OSU Publ., 2018, 58 p.
  7. Duplyakin V.M. [Features of identification of the normal distribution law]. Vestnik Samarskogo universiteta. Ekonomika i upravlenie = Vestnik of Samara University. Economics and Management, 2020, vol. 11, no. 3, pp. 176–183. URL: Link (In Russ.)
  8. Rodionov D.G., Dmitriev N.D., Dubanevich L.E. [Construction of an econometric model of sustainable development of an industrial enterprise]. Vestnik Altaiskoi akademii ekonomiki i prava = Vestnik of Altai Academy of Economics and Law, 2021, no. 7-1, pp. 61–71. URL: Link (In Russ.)
  9. Rudskaya I.A., Rodionov D.G. [Methodological principles and stages of formation of an enterprise’s financial strategy]. KANT, 2018, no. 4, pp. 350–355. URL: Link (In Russ.)
  10. Sokolitsyna N., Sokolitsyn A. Modeling of Production Processes Parameters of Industrial Enterprises. Sustainable Development and Engineering Economics, 2022, iss. 2, 80 p. URL: Link
  11. Shuleshko A.N. [Methodology for reducing financial risks]. Vestnik ekonomicheskoi integratsii = Bulletin of Economic Integration, 2011, no. 11, pp. 37–42. (In Russ.)
  12. Gusev A.V. [Peculiarities of calculating the investment efficiency of the region’s projects using the NPV method]. Marketing i logistika = Marketing and Logistics, 2018, no. 3, pp. 34–39. URL: Link (In Russ.)
  13. Polyanin A.V., Golovina T.A. [The concept of innovation management of industrial systems based on digital twin technology]. π-Economy, 2021, vol. 14, no. 5, pp. 7–23. (In Russ.) URL: Link
  14. Kleiner G.B. [Economic and mathematical modeling and the economic theory]. Ekonomika i matematicheskie metody = Economics and Mathematical Methods, 2001, vol. 37, no. 3, pp. 111–127. URL: Link (In Russ.)

View all articles of issue

 

ISSN 2311-8709 (Online)
ISSN 2071-4688 (Print)

Journal current issue

Vol. 30, Iss. 8
August 2024

Archive